سڀ درجا بندي
EN

گهر>مصنوعات>اسٽيل جون نليون ۽ پائپ

62
61
62
61

Factory Directly Sale Construction Steel Pipe Gi Pipe Price For Building Material


اصل جو هنڌ Tianjin, China(mainland)
برانڊ جو نالو: GOLDENSUN STEEL
ماڊل تعداد: GSS00403
سرٽيفڪيٽ: ISO,BV


اسان سان رابطو ڪريو
Specifications
گھٽ ۾ گھٽ مقدار جي مقدار 15 ٽونز
قيمت: FOB XINGANG: 500-700 USD PER TON
پيڪنگ جا تفصيل: 1. Packed with 8 bundles tightened with metal belt and plastic wrapped if need
2. According to customer’s requirement
پهچائڻ جو وقت: جمع جي 30 ڏينهن بعد وصولي
ادائگي جي شرطن: 30% T/T deposit in advance, 70% T/T balance after B/L copy ;
100% Irrevocable L/C at sight,;100% Irrevocable L/C after receive
B/L copy 30-120 Days; O/A
رسائي جي صلاحيت: 10000 ميٽرڪ ٽون / ميٽرڪ ٽائون هر مهيني


وضاحت

شئ جو نالو جي پي پائپ
ٽيڪنڪ Longitudinal Electronic Resistance Welding(ERW)
High Frequency Welding(HFW)
مادي معيار Steel Grade       Q195 similar to a283 GR.B, 040a10, ss330, sphc
                          Q235 similar to a283 GR.D, 080a15,CS type B

                          Q345 similar to a737 GR.B, SS400, S235JR

Material Type    Available in cold rolled and hot rolled

ڪرائون سائيز واري W.T                    1mm-12mm

Diameter           15mm-273mm

Length               1m - 12m

مٿاڇري Galvanized, 3PE, painting, coating oil, steel stamp, drilling, etc
آخر ۾ Plain ends, cutting, threading, beveled, flange, etc
Packing Packing in bundle with steel strips; with seaworthy package at the end; could be done with your requirement.
جي چڪاس With Chemical Composition and Mechanical Properties Testing; Hydrostatic Test, Dimensional and Visual Inspection,  With Nondestructive Inspection
سرٽيفڪيٽ BV, IAF, SGS,COC, ISO or as per customer
درخواست Urban construction pipe, machine structure pipe, agriculture equipment pipe, water and gas pipe, Greenhouse pipe, Scaffolding pipe, Building material tube, Furniture tube, Low pressure fluid tube, Oil pipe, etc
تجارتي شرطون FOB, CFR, CIF, EXW, etc.
ادائگي L/C, D/A, D/P, T/P Western Union, MoneyGram acceptable, T/T preferred
پهچائڻ وقت Usually within 10-30 days after receipt of deposit, ASAP
پورٽ لوڊ ڪندي Xingang , Tianjin
تعاون
Ship-owner
MSK, CMA, MSC, HMM, COSCO, UA, NYK, OOCL, HPL, YML, MOL


Specifications

79


80

انڪوائري