tout Kategori
EN

Kay>PRODUCTS>Tib Steel & tiyo

62
61
62
61

Faktori Dirèkteman Vann Konstriksyon Steel Pipe Gi Pri Pipe Pou Materyèl Building


Kote li soti: Tianjin, Lachin (tè pwensipal)
Non Brand: GOLDENSUN STEEL
Nimewo Modèl: GSS00403
sètifikasyon: ISO,BV


Kontakte nou
Espesifikasyon
Minimòm Lòd Kantite: 15TONS
Prix: FOB XINGANG: 500-700 USD pou chak tòn
Anbalaj Detay: 1. Chaje ak 8 offres sere ak senti metal ak plastik vlope si sa nesesè
2. Selon kondisyon kliyan an
Tan livrezon: 30 jou apre li resevwa depo
Peman Terms: 30% T / T depo davans, 70% T / T balans apre kopi B / L;
100% irevokabl L / C nan je,; 100% irevokabl L / C apre resevwa
B / L kopi 30-120 jou; O / A
Bay Abilite: 10000 tòn metrik / tòn metrik pou chak mwa


Deskripsyon

File pwodwi GI Pipe
Technique Longitudinal Electronic Resistance Welding(ERW)
High Frequency Welding(HFW)
Kalite materyèl Steel Grade       Q195 similar to a283 GR.B, 040a10, ss330, sphc
                          Q235 similar to a283 GR.D, 080a15,CS type B

                          Q345 similar to a737 GR.B, SS400, S235JR

Material Type    Available in cold rolled and hot rolled

Kantite moun ki W.T                    1mm-12mm

Diameter           15mm-273mm

Length               1m - 12m

Andigman Galvanized, 3PE, painting, coating oil, steel stamp, drilling, etc
Fen Plain ends, cutting, threading, beveled, flange, etc
D ' Packing in bundle with steel strips; with seaworthy package at the end; could be done with your requirement.
Enspeksyon With Chemical Composition and Mechanical Properties Testing; Hydrostatic Test, Dimensional and Visual Inspection,  With Nondestructive Inspection
sètifikasyon BV, IAF, SGS,COC, ISO or as per customer
aplikasyon Urban construction pipe, machine structure pipe, agriculture equipment pipe, water and gas pipe, Greenhouse pipe, Scaffolding pipe, Building material tube, Furniture tube, Low pressure fluid tube, Oil pipe, etc
Regleman komès FOB, CFR, CIF, EXW, etc.
Peman L/C, D/A, D/P, T/P Western Union, MoneyGram acceptable, T/T preferred
Tan livrezon Usually within 10-30 days after receipt of deposit, ASAP
Loading Port Xingang , Tianjin
Koperasyon
Ship-owner
MSK, CMA, MSC, HMM, COSCO, UA, NYK, OOCL, HPL, YML, MOL


Espesifikasyon

79


80

INQUIRY