Čelična cijev presvučena 3PE SSAW čelične cijevi / spiralno zavarene čelične cijevi
Mjesto podrijetla: | Tianjin, Kina (kopno) |
Brand Name: | GOLDENSUN ČELIK |
Broj modela: | GSS00204 |
Certifikacija: | SGS, BV |
Tehnički podaci
Minimalna narudžba Količina: | 15 TONA |
Cijena: | FOB XINGANG: 400-600 USD PO TONU |
Pakiranje Detalji: | 1. Packed with 8 bundles tightened with metal belt and plastic wrapped if need 2. According to customer’s requirement |
Vrijeme isporuke: | Dostavljeno u roku od 30 dana nakon primitka pologa |
Uvjeti plaćanja: | 30% T/T deposit in advance, 70% T/T balance after B/L copy ; 100% Irrevocable L/C at sight,;100% Irrevocable L/C after receive B/L copy 30-120 Days; O/A |
Nabava Sposobnost: | 5000 metričkih tona / metričkih tona mjesečno |
Specifikacije:
There are some detailed specifications ofspiral steel pipe that we produce for our customers all over the world.
Oiled marking
● Steel after passing wrer oiled to prevent corrosion,and according to user requirements for making.
Leveling Milling
● The flat steel anvil machine so that the origal curl,and then thouth the edge milling machine for two-sided steel milling,so as to meet the requirements of the plate width,plate edge parallelism and groove shape.
Shear molding
● The steel plate production line along the outer edge of the spiral curl into a tube.
Butt cut
● Double-sided submerged arc welding using advanced technology to pre-welding,internal welding,outside wilding.The welded steel pipe using a plasma-foot cut to specification length.
Factory Processes of SSAW Steel pipe
Production equipment is sign of productivity level.Sophisticated production facilities represent advanced productivity.
Scientific test equipment for ssaw steel pipe