Nui pakuhi 3PE uhi ʻia SSAW Steel Pipe / ʻoni iho Welded Steel Pipe
Place o Kinohi: | Tianjin, Kina (ʻāina nui) |
Brand Name: | MOKUAHI GOLDENSUN |
Model Number: | GSS00204 |
palapala hoʻomaikaʻi: | SGS, BV |
hoakaka
ʻO ke kauʻanaʻana o ka mea nui: | 15TONS |
Price: | FOB XINGANG: 400-600 USD KAHI |
Hōʻikeʻikepili: | 1. Hoʻopili ʻia me nā pūʻolo he 8 i hoʻopaʻa ʻia me ke kāʻei hao a me ka ea i wahī ʻia inā pono 2. Wahi a ka makemake o ka mea kūʻai |
Delivery Time: | Lawe ʻia i loko o 30 mau lā ma hope o ka loaʻa ʻana o ka waiho |
Uku LIKE: | 30% T / T waiho ma mua, 70% T / T koena ma hope o B / L kope; 100% L / C hiki ʻole ke hoʻoliʻiliʻi i ka ʻike maka,; 100% L / C hiki ke hoʻoliʻiliʻi ma hope o ka loaʻa B / L kope 30-120 Lā; ʻO / A |
Ka lako kūpono: | 5000 Metric Ton / Metric Tona i kēlā me kēia mahina |
Kūlana kūpono:
There are some detailed specifications ofspiral steel pipe that we produce for our customers all over the world.
Oiled marking
● Steel after passing wrer oiled to prevent corrosion,and according to user requirements for making.
Leveling Milling
● The flat steel anvil machine so that the origal curl,and then thouth the edge milling machine for two-sided steel milling,so as to meet the requirements of the plate width,plate edge parallelism and groove shape.
Shear molding
● The steel plate production line along the outer edge of the spiral curl into a tube.
Butt cut
● Double-sided submerged arc welding using advanced technology to pre-welding,internal welding,outside wilding.The welded steel pipe using a plasma-foot cut to specification length.
Factory Processes of SSAW Steel pipe
Production equipment is sign of productivity level.Sophisticated production facilities represent advanced productivity.
Scientific test equipment for ssaw steel pipe