Gi pipe/tube/building material greenhouse pre galvanzied steel pipe
Place of Origin: | Tianjin, China(mainland) |
Brand Name: | Goldensun Steel |
Model Number: | GS00503 |
Certification: | ISO |
Specifications
Minimum Order Quantity: | 15TONS |
Price: | FOB XINGANG: 450-600 USD PER TON |
Packaging Details: | 1. Packed with 8 bundles tightened with metal belt and plastic wrapped if need 2. According to customer’s requirement |
Delivery Time: | Delivered within 30 days after receipt of deposit |
Payment Terms: | 30% T/T deposit in advance, 70% T/T balance within 5 days after B/L copy, 100% Irrevocable L/C at sight, 100% Irrevocable L/C after receive B/L 30-120 days, O/A |
Supply Ability: | 3000 Metric Ton/Metric Tons per Month |
Description
Product | Galvanized Steel Pipe |
Diameter | 21.3mm-219.1mm |
W.T | 0.8-30mm |
Test | Chemical Component Analysis, Mechanical Properties, Technical Properties, Exterior Size Inspection |
length | 1-12m or according to per request |
Steel Grade | IS 3589, IS 1239, IS:1161 Fe 330, Fe 410) BS 1387, BS4568, S185, S235, S235JR, S235 G2H, S275, S275JR, S355JRH S355J2H, St12, St13, St14, St33, St37, St44, ST52 JIS G3444 STK290,STK400,STK500,STK490,STK540 |
Material | Q195—Grade B, SS330, SPC, S185,ST37 Q215—Grade C,CS Type B, SS330, SPHC Q235---Grade D, SS400, S235JR, S235JO, S235J2 Q345---SS500, ST52 10#,20#,45#, etc |
Surface treatment | 1)Oiled 2) Galvanized 3)3PE Anti-corruption coated 4)Painting black 5)According to the customers’ requirement |
Zinc coating | 40g,60g,80g,100g,120g,270g,400g,500g,550g 7μm ,8μm, 15μm ,20μm ,40μm ,60μm,70μm,80μm |
SHIPPING (Normally arrive port time in working days) | ||||
DESTINATION | Express/Courier DHL/FedEx/TNT/UPS | Ship by sea | Ship by air | Ship by EMS |
North America | 3-7 days | 15-24 days | 5-7 days | 10-12 days |
South America | 3-7 days | 15-25 days | 5-7 days | 10-12 days |
European countries | 3-7 days | 20-30 days | 5-7 days | 10-12 days |
Africa Countries | 3-7 days | 45-50 days | 5-7 days | 10-12 days |
The Middle East | 3-7 days | 15-25 days | 5-7 days | 10-12 days |
Australia | 3-7 days | 10-15 days | 5-7 days | 10-12 days |